Back to Training

AC Tune Up Process

0% Complete
0/0 Steps
  1. AC Tune Up Process Intro
  2. AC Tune Up Accountability
  3. Getting A Time Commitment
  4. Setting The Tune Up Expectation
  5. Explaining The AC System Operation
  6. Part 1 - Temperature Splits
  7. Part 2 - Temperature Splits
  8. Setting The Condenser Cleaning Expectation
  9. Explaining The Condenser Operation
  10. Tools For The Job
  11. Starting The AC Tune Up
  12. Hooking Up Your Gauges
  13. Reengaging To Test The Electrical Components Of The Condenser
  14. Reading The Nomenclature
  15. Testing LRA, RLA & FLA
  16. Explaining The Condenser Fan Motor Assembly
  17. Explaining The Internal Compressor
  18. Vacuuming Out The Condenser
  19. Testing The Run Capacitor
  20. Testing High Voltage
  21. Testing The Fuses
  22. Explaining The Run Capacitor
  23. Explaining The Contactor
  24. Cleaning The Condenser Coils
  25. Rinsing The Condenser
  26. Showcase The Tune Up
  27. Preparing For The Attic & Duct Inspection
  28. Attic With Ducts Only
  29. Attic With System & Ducts
  30. Insulation Level Check
  31. Drawing Their Duct System
  32. Going Over The Perfect System
  33. Preparing For Options
  34. Building Our Options
  35. Offering Financing
AC Tune Up Process Testing High Voltage
Video 20 of 35
In Progress
← Previous Next→

Testing High Voltage

Testing the high voltage disconnect.

Testing High Voltage
Clear Clear All